Sand Calculator
Calculate the sand (fine aggregate) required for a concrete volume at a chosen grade, in cubic feet and cubic metres, with cement and aggregate shown too.
Result
| Material | Quantity |
|---|
Disclaimer: This tool provides an indicative estimate for general planning only and is not professional, legal, financial, medical or engineering advice. Reference values are editable defaults that vary by location, vendor, regulation and date. Verify critical figures with a qualified professional. Varada Nexus accepts no liability for decisions made using this tool.
Get expert help
Related services: Hospital Infrastructure · Hospital Consultancy
Browse: Hospital Construction tools · All tools · Contact
Planning a project?
Share your numbers and we will help you plan the next step.
Contact Varada Nexus for detailed consultationFAQ
How much sand per m³ of concrete?
About 0.42 m³ (≈15 cft) of sand per m³ of M20 concrete (1:1.5:3).
Why multiply by 1.54?
It converts wet concrete volume to the dry material volume required before mixing.
Cft or m³?
Sand is often sold in cft in India; this tool shows both.